Calculations and Directive Budgets

Based on your technical drawings provided to or created by CECC for your projects or installations, or by analyzing your specifications of work, CECC can provide you with accurate calculations of the cost of any installations and also a directive budget. If a large project is contracted out, the directive budget is an important mechanism for verifying which submitted bids are within reason and which bids are hugely over or underpriced. This is a great way of ensuring your chosen contractor is providing you with work to the standard that you not only expect, but that they are promising.